Rate Schedule

Battle River Power Coop Distribution Tariff

Effective March 26, 2025

Rate - Rural Farm/Acreage BR240

Breaker Size 3 kVA 5 kVA 7.5 kVA 10 kVA 15 kVA 25 kVA >25 kVA
Monthly Operating $69.98 $69.98 $87.80 $102.82 $131.51 $188.56 $4.87*/kVA

* $188.56 + $4.87 per kVA above 25 kVA

Demand Services are reset monthly with a minimum of the transformer capacity of 25 kVA**

Rate - Demand Industrial BR410

0-50 kVA - $5.03/kVA 51-500 kVA - $3.14/kVA >500 kVA - $2.14/kVA

Rate - Oil and Gas BR510

Service charge per kVA per day $0.6644
Daily charge $0.5356

Rate - Residential DT rate BR120

Distribution Component
Service Charge per Unit $0.9631/day
All kWh Delivered 3.1158 cents/kWh
Individual metered residential sites shared transformers

Rate - Idle Service BR110C

No Size Requirement

Monthly Operating $39.71
Additional Pole $1.81

Rate - Street Lighting (Investment Option) BR310

Subdivision Only
Based on fixture cost, watts and type (i.e. led)
Once investment is paid rates decline to maintenance only pricing

Transmission (SYSA) Rate

Current Rate$0.03200 per kWh
The current FortisAlberta AUC approved rate including all applicable rate riders, and in accordance with Battle River Power Cooperative Terms & Conditions.

Energy Affiliated Retail Rates

Contract Rate Rate of Last Resort
(Jan 1, 2025 - Dec 31, 2026)
Rate Refer to Energy Contract $0.130 per kWh
Fixed Charges $7.00 $7.00
UFE & Line Loss Included Included

Miscellaneous Charges

Disconnect Fee $110.00
Reconnect Fee $110.00
On Site Meter Platter Test $250.00 Charged only at member request
Charge to go on/off idle $60.00 Must be idle for 12 month period or priced at service call @ $250.00
First energize (Subdivision) $300.00